Policy Compass
Other topics

Modifications to the gas Regulatory Instructions and Guidance, Regulatory Reporting Packs and the PCFM Guidance for RIIO-2 Year 3

Share the page

On 27 February 2024, the Authority issued a Notice proposing modifications to the RIIO-2 Regulatory Instructions and Guidance (RIGs), the Regulatory Reporting Packs (RRPs) and the PCFM Guidance for gas transmission and distribution networks.

We are now publishing the modified versions of the RIIO-2 RIGs, RRPs and PCFM Guidance, following the receipt of stakeholder feedback on the notice. These modifications are made for the purpose of clarifying the reporting requirements for network licensees and will have taken affect from 4 April 2023. For the avoidance of doubt, annual reporting information submitted in respect of the 2023 to 2024 regulatory year should comply with the RFPR template and RIGs, as modified.

The decision for the electricity transmission RIGs will be published at a later date.

Main document

[Decision on modification to the RIIO-GT2 and GD2 RIGs - April 2024 [PDF, 183.67KB]

](https://www.ofgem.gov.uk/sites/default/files/2024-04/Decision%20to%20modify%20the%20GD%20and%20GT%20RIIO-2%20RIGs%20and%20RRPs_2023-24_0.pdf)

Subsidiary documents

[RIIO-GT2 Regulatory Instructions and Guidance v.2.3 clean [PDF, 800.75KB]

](https://www.ofgem.gov.uk/sites/default/files/2024-04/RIIO-GT2%20-%20Regulatory%20Instructions%20and%20Guidance%20v2.3%20Clean.pdf)

[RIIO-GT2 Regulatory Instructions and Guidance v.2.3 tracked [PDF, 804.69KB]

](https://www.ofgem.gov.uk/sites/default/files/2024-04/RIIO-GT2%20-%20Regulatory%20Instructions%20and%20Guidance%20v2.3%20tracked.pdf)

[RIIO-GT2 Regulatory Reporting Pack v2.3 [XLSX, 5.82MB]

](https://www.ofgem.gov.uk/sites/default/files/2024-04/RIIO-GT2%20-%20Regulatory%20Reporting%20Pack%20v2.3.xlsx)

[RIIO-GT2 PCFM Guidance (clean) [PDF, 313.39KB]

](https://www.ofgem.gov.uk/sites/default/files/2024-04/GT2%20PCFM%20Guidance%20v1.3_Clean.pdf)

[RIIO-GT2 PCFM Guidance (tracked) [PDF, 318.59KB]

](https://www.ofgem.gov.uk/sites/default/files/2024-04/GT2%20PCFM%20Guidance%20v1.3_Tracked.pdf)

[RIIO-GD2 Regulatory Instructions and Guidance v.1.16 clean [PDF, 1.52MB]

](https://www.ofgem.gov.uk/sites/default/files/2024-04/RIIO-GD2%20-%20Regulatory%20Instructions%20and%20Guidance%20v1.16%20clean.pdf)

[RIIO-GD2 Regulatory Instructions and Guidance v.1.16 tracked [PDF, 1.57MB]

](https://www.ofgem.gov.uk/sites/default/files/2024-04/RIIO-GD2%20-%20Regulatory%20Instructions%20and%20Guidance%20v1.16%20tracked.pdf)

[RIIO-GD2 Regulatory Reporting Pack v1.18 [XLSX, 5.33MB]

](https://www.ofgem.gov.uk/sites/default/files/2024-04/RIIO-GD2%20-%20Regulatory%20Reporting%20Pack%20v1.18.xlsx)

[RIIO-GD2 PCFM Guidance (clean) [PDF, 293.74KB]

](https://www.ofgem.gov.uk/sites/default/files/2024-04/GD2%20PCFM%20Guidance%20%28clean%29.pdf)

[RIIO-GD2 PCFM Guidance (tracked) [PDF, 303.97KB]

](https://www.ofgem.gov.uk/sites/default/files/2024-04/GD2%20PCFM%20Guidance%20%28tracked%29.pdf)

Share the page