Electricity transmission
Offshore Transmission Network Review: Decision on asset classification
Related links
- Minded-to Decision and further consultation on Pathway to 2030
- Consultation on changes intended to bring about greater coordination in the development of offshore energy networks
Share the page
This letter outlines our decision on the classification of the assets included in National Grid Electricity System Operator’s (NGESO) first Holistic Network Design (HND) into three categories:
- Onshore transmission (reinforcement)
- Radial offshore transmission
- Non-radial offshore transmission
We set out in this letter the regulatory framework, our decision-making process, and resulting classifications and delivery models for this round of HND assets.
Main document
[Offshore Transmission Network Review: Decision on asset classification [PDF, 1.57MB]
Related links
- Minded-to Decision and further consultation on Pathway to 2030
- Consultation on changes intended to bring about greater coordination in the development of offshore energy networks