Electricity transmission
Argyll and Kintyre 275kV Reinforcement project: Direction to allow Final Needs Case submission
Share the page
This direction is issued to relieve the Licensee of the requirement to secure all material planning consents prior to seeking approval to submit the Argyll and Kintyre 275kV Reinforcement Final Needs Case for assessment.
Main document
[Argyll and Kintyre Direction [PDF, 127.96KB]
](https://www.ofgem.gov.uk/sites/default/files/2023-05/Argyll%20and%20Kintyre%20Direction.pdf)
Share the page
Decision on modification to the special conditions of the Electricity Transmission Licence held by National Grid Electricity System Operator Limited
Decision
Erratum Notice: Statutory consultation on a proposal to modify the special conditions of the Electricity Transmission Licence held by National Grid Electricity System Operator Limited - March 2023
Licence modification