Future System Operator (FSO) draft licences consultation
Related links
- Proposals for a Future System Operator role
- Future System Operator: second policy consultation and project update
Share the page
We are consulting on two proposed draft licences which would be held by the Future System Operator (FSO). Specifically, an Electricity System Operator (ESO) licence and Gas System Planner (GSP) licence, which will be granted (or treated as granted) once the Secretary of State designates the FSO under the Energy Bill.
This non-statutory licence consultation includes the proposed conditions for the FSO’s ESO and GSP licences that we believe are not impacted by policy decisions on the financial model. We intend to consult on the proposed financial licence conditions, consequential modifications to other licences and associated documents later in the year. We also intend to undertake a statutory consultation under the Energy Bill powers for the licences alongside the Department for Energy Security and Net Zero (DESNZ), ahead of FSO designation.
This consultation is intended to be read alongside the joint DESNZ and Ofgem ‘Proposal for a Future System Operator’ and ‘FSO Second policy consultation and update’ consultations.
Respond name
Future System Operation
Respond email
Main document
[Future System Operator Draft Licences Consultation Document [PDF, 713.00KB]
Subsidiary documents
[Annex A - Electricity System Operator Draft Licence CLEAN [PDF, 1.31MB]
[Annex B - Electricity System Operator Draft Licence MARKED UP [PDF, 2.07MB]
[Annex C - Gas System Planner Draft Licence CLEAN [PDF, 532.22KB]
[Annex D - Definitions Master List [XLSX, 53.39KB]
[Annex E - NGESO Conditions Assessment [PDF, 172.72KB]
[Non-confidential responses - Draft licences consultation [ZIP, 3.67MB]
[Draft Licences Consultation Responses Log (Sep-Oct 2023) [XLSX, 171.78KB]
Related links
- Proposals for a Future System Operator role
- Future System Operator: second policy consultation and project update
Share the page
Decision to grant National Grid Electricity System Operator extension to derogation from Standard Licence Condition C28 for Net Transfer Capacity - September 2023
Decision
Statutory consultation on a proposal to modify the Special Conditions of the Electricity Transmission licence held by National Grid Electricity System Operator Limited - September 2023
Consultation