North West Wales (PTC1 and PTNO) – Early Construction Funding and proposed modification to the special conditions of the electricity transmission licence

Share the page

This consultation sets out our Early Construction Funding (ECF) assessment of the North West Wales project (PTC1 and PTNO) under the Accelerated Strategic Transmission Investment (ASTI) re-opener and our proposed modification to Appendix 1 within Special Condition (SpC) 3.41 'Accelerated strategic transmission investment Re-opener and Price Control Deliverable term (ASTIRt)'.

Respond name

Keren Maschler

Respond telephone

[020 7901 7000](tel:020 7901 7000)

Respond email

RIIOElectricityTransmission@ofgem.gov.uk

Main document

[North West Wales Early Construction Funding and licence statutory consultation [PDF, 417.75KB]

](https://www.ofgem.gov.uk/sites/default/files/2024-02/North%20West%20Wales%20Early%20Construction%20Funding%20and%20licence%20statutory%20consultation.pdf)

Subsidiary documents

[bp and EnBW NWW response [PDF, 158.08KB]

](https://www.ofgem.gov.uk/sites/default/files/2024-08/bp_and_EnBW_NWW_response.pdf)

[SPT NWW consultation response [PDF, 85.51KB]

](https://www.ofgem.gov.uk/sites/default/files/2024-08/SPT_NWW_consultation_response.pdf)

Share the page

North West Wales (PTC1 and PTNO) – Early Construction Funding and proposed modification to the special conditions of the electricity transmission licence