Decision to modify the special licence conditions in the electricity transmission licences: Accelerated Strategic Transmission Investment

Share the page

In December 2022 we decided to introduce a new Accelerated Strategic Transmission Investment (ASTI) regulatory framework. This framework will assess, fund and incentivise the accelerated delivery of the large, strategic onshore transmission projects required to deliver the government's ambition to connect up to 50GW of offshore wind generation to the network by 2030.

In May 2023 we consulted on the licence modifications required to give effect to our ASTI decision. Following consideration of the consultation responses, this publication details our decision to introduce three new special conditions (SpC 3.40, SpC 3.41, SpC 4.9), modify three existing special conditions (SpC 1.1, SpC 3.14, SpC 3.15), modify the Price Control Deliverable Reporting Requirements and Methodology Document and introduce a new Accelerated Strategic Transmission Investment Guidance and Submission Requirements Document.

Main document

[Decision to modify the electricity transmission special licence conditions: Accelerated Strategic Transmission Investment [PDF, 569.69KB]

](https://www.ofgem.gov.uk/sites/default/files/2023-08/Decision%20to%20modify%20the%20special%20licence%20conditions%20in%20the%20electricity%20transmission%20licences%20Accelerated%20Strategic%20Transmission%20Investment.pdf)

Subsidiary documents

[Accelerated Strategic Transmission Investment Guidance And Submission Requirements Document [PDF, 666.46KB]

](https://www.ofgem.gov.uk/sites/default/files/2023-08/Accelerated%20Strategic%20Transmission%20Investment%20Guidance%20And%20Submission%20Requirements%20Document.pdf)

[Appendix 6 to the PCD Reporting Requirements and Methodology Document [PDF, 177.12KB]

](https://www.ofgem.gov.uk/sites/default/files/2023-08/Appendix%206%20to%20the%20PCD%20Reporting%20Requirements%20and%20Methodology%20Document.pdf)

[Notice of Modification of the Special Licence Conditions of the Electricity Transmission Licences [PDF, 101.03KB]

](https://www.ofgem.gov.uk/sites/default/files/2023-08/Notice%20of%20Modification%20of%20the%20Special%20Conditions%20of%20the%20Electricity%20Transmission%20licences.pdf)

[Direction to Issue the Accelerated Strategic Transmission Investment Guidance and Submission Requirements Document [PDF, 138.53KB]

](https://www.ofgem.gov.uk/sites/default/files/2023-08/Direction%20to%20Issue%20the%20Accelerated%20Strategic%20Transmission%20Investment%20Guidance%20And%20Submission%20Requirements%20Document.pdf)

[ASTI licence CHANGE LOG [PDF, 235.04KB]

](https://www.ofgem.gov.uk/sites/default/files/2023-08/ASTI%20licence%20CHANGE%20LOG.pdf)

[ASTI licence modifications - NGET Annex [PDF, 665.17KB]

](https://www.ofgem.gov.uk/sites/default/files/2023-08/ASTI%20licence%20modifications%20-%20NGET%20Annex.pdf)

[ASTI licence modifications - SHET Annex [PDF, 597.78KB]

](https://www.ofgem.gov.uk/sites/default/files/2023-08/ASTI%20licence%20modifications%20-%20SHET%20Annex.pdf)

[ASTI licence modifications - SPT Annex [PDF, 578.02KB]

](https://www.ofgem.gov.uk/sites/default/files/2023-08/ASTI%20licence%20modifications%20-%20SPT%20Annex.pdf)

[Price Control Deliverable_Reporting_Requirements_and_Methodology_Document_v4 [PDF, 359.38KB]

](https://www.ofgem.gov.uk/sites/default/files/2023-08/Price%20Control%20Deliverable_Reporting_Requirements_and_Methodology_Document_v4.pdf)

[Tracked change document versions [ZIP, 2.52MB]

](https://www.ofgem.gov.uk/sites/default/files/2023-08/Tracked%20change%20versions.zip)

[ASTI Erratum Notice - 12 Sep 2023 [PDF, 101.24KB]

](https://www.ofgem.gov.uk/sites/default/files/2023-09/ASTI%20Erratum%20notice%20-%2012th%20Sep%202023.pdf)

Share the page