Norwich Tilbury: Early Construction Funding decision

Share the page

This document confirms our decision to approve Early Construction Funding (ECF) for the Norwich to Tilbury electricity transmission project. This decision is taken in line with National Grid Electricity Transmission’s (NGET) electricity transmission licence (the Licence), Special Condition (SpC) 3.41 ‘Accelerated strategic transmission investment Re-opener and Price Control Deliverable term (ASTIRt)’.  

Main document

[Norwich Tilbury ECF decision document [PDF, 247.96KB]

](https://www.ofgem.gov.uk/sites/default/files/2025-04/Norwich-Tilbury-ECF-Decision-Document.pdf)

Subsidiary documents

[Notice of Modification of the SpC 3.41 of the electricity transmission licence held by NGET [PDF, 329.01KB]

](https://www.ofgem.gov.uk/sites/default/files/2025-04/Notice-Modification-of-the-SpC-3.41-of-the-electricity-transmission-licence-held-by-NGET.pdf)