Decision on modifications to the ESO Regulatory Instructions and Guidance and Regulatory Reporting Pack for RIIO-2
Related links
Decision on the funding of the transition to a Future System Operator
Share the page
On 6 September 2023, the Authority issued a Notice proposing modifications to the RIIO-2 RIGs and the RRPs for Electricity System Operator (ESO). We are now publishing the modified versions of the RIIO-2 RIGs and RRPs following the receipt of stakeholder feedback on the Notice.
These modifications are made for the purpose of aligning the RIGs and RRPs with the National Grid Electricity System Operator Limited Electricity Transmission Statutory Licence Consultation published on 6 September 2023. We outline these modifications in our Decision Notice.
The modifications will take effect from 18 October 2023.
The RIGs are tracked to show the location of modifications relative to previously published versions.
Modifications to the RRP are logged in the ‘Changes Log’ sheet. Please note any modifications to the RRP implemented as a result of the response to the consultation are noted in the Issue Log, published alongside the Decision Notice.
Main document
[Decision Notice on modification to the ESO RIIO-2 RIGs, RRPs and PCFM Guidance [PDF, 132.19KB]
Subsidiary documents
[RIIO-2 ESO – Regulatory Instructions and Guidance v3.0 (clean) [PDF, 547.24KB]
[RIIO-2 ESO – Regulatory Instructions and Guidance v3.0 (tracked) [PDF, 565.03KB]
[RIIO-2 ESO Regulatory Reporting Pack [XLSX, 1.07MB]
[Consultation Issue Log ESO Regulatory Instructions and Guidance and Regulatory Reporting Pack for RIIO-2 [XLSX, 49.89KB]
](https://www.ofgem.gov.uk/sites/default/files/2023-10/Consultation%20Issue%20Log.xlsx)
Related links
Decision on the funding of the transition to a Future System Operator