Notice of proposed modifications to the ESO Regulatory Instructions and Guidance and Regulatory Reporting Pack for RIIO-2 – May 2024
Related links
- Business Plan 2 Final Determinations - Electricity System Operator
- Funding the transition to a Future System Operator
- Decision on modifications to the ESO Regulatory Instructions and Guidance and Regulatory Reporting Pack for RIIO-2
Share the page
We are consulting on proposed modifications to the RIIO-2 Regulatory Instructions and Guidance (RIGs) and Regulatory Reporting Pack (RRP) for the Electricity System Operator (ESO).
We are proposing a number of modifications to the RIGs and RRP to reflect the costs relating to the New Roles, FSO Transition costs, National Grid payments and the introduction of the fixed BSUoS tariffs.
The RIGs are tracked to show the location of modifications relative to previously published versions.
Respond name
Adam Gilham
Respond email
Main document
[Proposal to modify the ESO RIIO-2 RIGs and RRPs [PDF, 206.86KB]
[RIIO-2 ESO - Regulatory Instructions and Guidance: Version 3.1 (tracked) [PDF, 531.78KB]
[RIIO-2 ESO - Regulatory Reporting Pack: Version 3.1 [XLSX, 1.07MB]
Related links
- Business Plan 2 Final Determinations - Electricity System Operator
- Funding the transition to a Future System Operator
- Decision on modifications to the ESO Regulatory Instructions and Guidance and Regulatory Reporting Pack for RIIO-2
Share the page
Decision on 2024 modifications to the Regulatory Financial Performance Reporting (RFPR) for RIIO-2
Decision
Decision on modifications to the Regulatory Instructions and Guidance (RIGs), Regulatory Reporting Packs (RRPs) and the Price Control Financial Model (PCFM) Guidance: RIIO-ET2 Year 3 - Electricity Transmission
Decision