Energy network price controls
Decision on NGET’s 2022 MSIP Re-opener Applications
Related links header
- RIIO-2 Medium Sized Investment Project (MSIP) Re-opener Consultation
- Consultation on an Extreme Weather Resilience Medium Sized Investment Project from National Grid Electricity Transmission
- Consultation on a Sulphur Hexafluoride (SF6) Asset Intervention Medium Sized Investment Project from National Grid Electricity Transmission
- Statutory Consultation on a proposal to modify the Special Conditions of the Electricity Transmission Licence held by National Grid Electricity Transmission Plc
Share the page
We published consultations on our initial assessment of each of the following MSIP projects on:
-
Sulphur hexafluoride (SF6) Asset Intervention: 9 August 2022
-
Extreme Weather Resilience: 18 May 2022
-
Cellarhead Customer Connection: 30 May 2022
-
Frodsham Customer Connection and Lister Drive Customer Connection: 30 May 2022
-
Melksham Operational Tripping Scheme Phase 2 Project: 30 May 2022
Consultations have now closed. We have published the non-confidential responses to each consultation alongside this document.
Main document
[Decision on NGET’s 2022 MSIP Re-opener Applications [PDF, 520.12KB]
](https://www.ofgem.gov.uk/sites/default/files/2023-04/Decision%20NGET%20MSIP%20re-openers_FINAL.pdf)
Related links header
- RIIO-2 Medium Sized Investment Project (MSIP) Re-opener Consultation
- Consultation on an Extreme Weather Resilience Medium Sized Investment Project from National Grid Electricity Transmission
- Consultation on a Sulphur Hexafluoride (SF6) Asset Intervention Medium Sized Investment Project from National Grid Electricity Transmission
- Statutory Consultation on a proposal to modify the Special Conditions of the Electricity Transmission Licence held by National Grid Electricity Transmission Plc