NESO Regulatory Instructions and Guidance and Reporting Pack: decision
Related links
RIIO-2: NESO regulatory instructions and guidance
Share the page
On 30 April 2025, the Authority issued a Notice proposing modifications to the RIIO-2 RIGs and the RRPs for National Energy System Operator (NESO). We are now publishing the modified versions of the RIIO-2 RIGs and RRPs following the receipt of stakeholder feedback on the Notice.
The modifications will take effect from 27 June 2025.
Background
The changes to the RIGs and RRP will reflect:
- the transition from National Grid Electricity System Operator to NESO
- the new Energy System Operator and Gas System Planner licences
- the new RRP tables
The RIGs are tracked to show the location of modifications relative to previously published versions.
View the RIIO-2: NESO regulatory instructions and guidance.
Main document
[NESO RIIO-2 RIGs and RRP modification decision [PDF, 127.87KB]
Subsidiary documents
[RIIO-2 NESO Regulatory Instructions and Guidance (tracked changes) [PDF, 538.36KB]
Related links
RIIO-2: NESO regulatory instructions and guidance