Policy Compass
Gas transmission

Bacton Terminal site development Final Preferred Option

Share the page

Our proposed Bacton Terminal site redevelopment Final Preferred Option following submission by National Gas Transmission of the Final Option Selection Report in compliance with Special Condition 3.10.

Respond name

Graham Craig

Respond telephone

[0141 354 5447](tel:0141 354 5447)

Respond email

graham.craig@ofgem.gov.uk

Main document

[Bacton Terminal site redevelopment Final Preferred Option (Redacted) [PDF, 620.91KB]

](https://www.ofgem.gov.uk/sites/default/files/2024-06/Consultation-Bacton-Terminal-FOSRt-Redacted.pdf)

Response documents

[BBLC Response to Bacton Terminal [PDF, 142.75KB]

](https://www.ofgem.gov.uk/sites/default/files/2024-08/BBLC_Response_to_Bacton_Terminal.pdf)

[IUK Response to Bacton Terminal [PDF, 114.30KB]

](https://www.ofgem.gov.uk/sites/default/files/2024-08/IUK_Response_to_Bacton_Terminal.pdf)

[NGT Response to Bacton Terminal [PDF, 186.17KB]

](https://www.ofgem.gov.uk/sites/default/files/2024-08/NGT_Response_to_Bacton_Terminal.pdf)

Share the page