GD2 Price Control Financial Handbook
Share the page
This page contains the latest and historical copies of the GD2 Price Control Financial Handbook (PCFH) since the beginning of the RIIO-GD2 price control.
Under part D of Special Condition 8.1 of the Gas Transporter Licence, the Authority is required to maintain a consolidated version of the GD2 PCFH on its website.
Part C of Special Condition 8.1 provides for the Authority to make modifications to the GD2 PCFH. These modifications are published during each regulatory year and are shown in the list of subsidiary documents below with the suffix "C01", "C02", and so on.
Main document
[GD2 PCFH C07 (published 31 May 2024) [PDF, 1.04MB]
](https://www.ofgem.gov.uk/sites/default/files/2024-07/GD2_PCFH_C07_%28published_31_May_2024%29.pdf)
Subsidiary documents
[GD2 PCFH C06 (published 8 September 2023) [PDF, 951.66KB]
](https://www.ofgem.gov.uk/sites/default/files/2024-07/GD2_PCFH_C06.pdf)
[GD2 PCFH C05 (published 05 June 2023) [PDF, 1.02MB]
](https://www.ofgem.gov.uk/sites/default/files/2024-03/GD2%20PCFH%20C05.pdf)
[GD2 PCFH C04 (published 11 November 2022) [PDF, 1.48MB]
[GD2 PCFH C03 (published 01 June 2022) [PDF, 1.53MB]
[GD2 PCFH C02 (published 13 December 2021) [PDF, 1.90MB]
](https://www.ofgem.gov.uk/sites/default/files/2021-12/GD2%20PCFH%20C02.pdf)
[GD2 PCFH C01 (published 30 July 2021) [PDF, 1.53MB]
](https://www.ofgem.gov.uk/sites/default/files/2021-11/GD2%20PCFH%20C01.pdf)
[GD2 PCFH C00 (published 28 May 2021) [PDF, 1.50MB]
](https://www.ofgem.gov.uk/sites/default/files/2021-11/GD2%20PCFH%20C00.pdf)
[GD2 PCFH Final Determinations (published 3 Feb 2021) [PDF, 0.97MB]
](https://www.ofgem.gov.uk/sites/default/files/2021-11/GD2%20PCFH%20Final%20Determinations%20.pdf)