Further consultation on the cap rate for the cap and floor regime for Window 3 electricity interconnectors
Related links
Share the page
We consulted on certain financial parameters of the cap and floor regime for electricity interconnectors included in Window 3 in September 2023. However, before reaching a decision, we are consulting further on the detailed parameters for the cap rate of the regime.
In this consultation we propose a specific methodology for estimating the equity beta parameter for Window 3 interconnectors, as well as updating the methodology for Total Market Return and Risk Free Rate.
Respond name
Nick Pittarello
Respond email
Main document
[Further consultation on the cap rate for the cap and floor regime for Window 3 electricity interconnectors [PDF, 376.76KB]
Response documents
[Response to consultation from National Grid Ventures [PDF, 244.60KB]
[Response to consultation from GridLink [PDF, 182.34KB]
[Response to consultation from SSE [PDF, 222.82KB]
[Response to consultation from MaresConnect [PDF, 269.32KB]
[Response to consultation from NU-Link [PDF, 176.70KB]
[Response to consultation from Transmission Investment LirIC [PDF, 261.84KB]