Consultation on further detailed regime parameters for the Offshore Hybrid Asset pilot scheme
Related links
Share the page
We are consulting on further detailed regime parameters for the Offshore Hybrid Asset (OHA) pilot scheme.
These are additional to the high-level regime parameters included in section 7 and Appendix 1 of our decision on the Regulatory Framework for the Non-Standard Interconnectors (NSIs) of the OHA pilot scheme of 8 February 2024.
The OHA pilot scheme comprises the proposed LionLink and Nautilus Non-Standard Interconnectors, which are to run from the United Kingdom to offshore converter stations, linked to offshore wind farms, in Netherlands and Belgian waters respectively.
Respond name
Kevin Magner
Respond email
Main document
[Consultation on further detailed regime parameters for the Offshore Hybrid Asset pilot scheme [PDF, 523.01KB]
Response documents
[Elia consultation response [PDF, 241.98KB]
](https://www.ofgem.gov.uk/sites/default/files/2025-04/ELIA-response.pdf)
[NGV consultation response [PDF, 356.08KB]
](https://www.ofgem.gov.uk/sites/default/files/2025-04/NGV-response.pdf)
[WindGrid consultation response [PDF, 84.21KB]
](https://www.ofgem.gov.uk/sites/default/files/2025-04/WindGrid-response.pdf)