Policy Compass
Electricity distribution

Statutory consultation on proposed amendments to the Electricity (Connection Standards of Performance) Regulations 2015

RIIO-ED2 Final Determinations

Share the page

We are consulting on proposed changes to the Electricity (Connection Standards of Performance) Regulations 2015. These standards need to be updated to reflect the decisions made as part of our RIIO-ED2 Final Determinations. Specifically, we are proposing to update the amounts that relevant electricity operators are required to pay to customers in the event of failing to meet the standards of performance set out in the regulations.

Respond email

RIIOED2@ofgem.gov.uk

Main document

[Statutory consultation on proposed amendments to the Electricity (Connection Guaranteed Standards of Performance) Regulations 2015 [PDF, 322.25KB]

](https://www.ofgem.gov.uk/sites/default/files/2023-04/Connection%20GSoPs%20Consultation_final.pdf)

Subsidiary documents

[Annex A - draft proposed statutory instrument [PDF, 205.73KB]

](https://www.ofgem.gov.uk/sites/default/files/2023-04/Annex%20A.pdf)

[Annex B - marked up version of current regulations [PDF, 336.83KB]

](https://www.ofgem.gov.uk/sites/default/files/2023-04/Annex%20B%20-%20Marked%20up%20changes%20to%20Connection%20GSOPs.pdf)

RIIO-ED2 Final Determinations

Share the page