Policy Compass
Metering

Consultation - DCC Switching Incentive Regime

Share the page

This is a consultation on a new Price Control mechanism through which we propose to incentivise DCC in their Switching roles. We are also consulting on the % value of margin that DCC should be permitted to earn in Switching under its Price Control.

This is a consultation on both policy and licence changes.

Respond name

Ayena Gupta

Respond telephone

[020 7901 7000](tel:020 7901 7000)

Respond email

DCCregulation@ofgem.gov.uk

Main document

[Consultation - DCC Switching Incentive Regime [PDF, 439.61KB]

](https://www.ofgem.gov.uk/sites/default/files/2022-11/Consultation%20-%20DCC%20Switching%20Incentive%20Regime.pdf)

Subsidiary documents

[Notice of Statutory Consultation - Smart Meter Communication Licence [PDF, 150.43KB]

](https://www.ofgem.gov.uk/sites/default/files/2022-11/Notice%20of%20statutory%20consultation%20-%20Smart%20Meter%20Communication%20Licence.pdf)

[Smart Meter Communication Licence - Proposed Licence changes for the DCC Switching Incentive Regime [PDF, 1.77MB]

](https://www.ofgem.gov.uk/sites/default/files/2022-11/Smart%20Meter%20Communication%20Licence%20-%20Proposed%20Licence%20changes%20for%20the%20DCC%20Switching%20Incentive%20Regime.pdf)

[ScottishPower response [PDF, 223.91KB]

](https://www.ofgem.gov.uk/sites/default/files/2023-01/SIR%20consultation%20-%20ScottishPower%20response_0.pdf)

[RECCo Response [PDF, 180.59KB]

](https://www.ofgem.gov.uk/sites/default/files/2023-01/SIR%20consultation%20-%20RECCo%20Response_0.pdf)

[NGED response [PDF, 609.93KB]

](https://www.ofgem.gov.uk/sites/default/files/2023-01/SIR%20consultation%20-%20NGED%20response_0.pdf)

[ENWL response [PDF, 171.67KB]

](https://www.ofgem.gov.uk/sites/default/files/2023-01/SIR%20consultation%20-%20ENWL%20response_0.pdf)

[EDF response [PDF, 105.09KB]

](https://www.ofgem.gov.uk/sites/default/files/2023-01/SIR%20consultation%20-%20EDF%20response_0.pdf)

[DCC response [PDF, 718.93KB]

](https://www.ofgem.gov.uk/sites/default/files/2023-01/SIR%20consultation%20-%20DCC%20response_0.pdf)

[SIR consultation - Centrica response.pdf [PDF, 194.45KB]

](https://www.ofgem.gov.uk/sites/default/files/2023-01/SIR%20consultation%20-%20Centrica%20response_0.pdf)

[BUUK response [PDF, 154.33KB]

](https://www.ofgem.gov.uk/sites/default/files/2023-01/SIR%20consultation%20-%20BUUK%20response_0.pdf)

Share the page

Consultation - DCC Switching Incentive Regime