Electricity interconnectors
Electricity interconnector Use of Revenues report - 2023
Share the page
Ofgem is required to annually publish, by 1 March, a report detailing the:
- amount of revenues collected by interconnector Transmission System Operators (TSOs) from the allocation of interconnector capacity; and
- the actual use of revenues by interconnector TSOs over the period 1 January to 31 December
EWIC, IFA, NGIFA2, Nemo Link and NGNSL have reported to Ofgem with respect to total revenues made and the actual use of revenues for the period 1 January 2023 to 31 December 2023.
Main document
[Use of Revenues report for 2023 [PDF, 121.53KB]
](https://www.ofgem.gov.uk/sites/default/files/2024-02/Use%20of%20Revenues%20report%20for%202023.pdf)