Electricity interconnectors
Electricity Interconnector Use of Revenues Report for 2021
Related links
- Use of Congestion Income Statement for 2020
- Decision on proposed modifications to the standard conditions of the electricity interconnector licence, the special conditions of the electricity interconnector licence held by NGIL and the electricity transmission licence held by NGESO
Share the page
Ofgem is required to publish, annually in March, a report detailing the:
- amount of revenues collected by interconnector Transmission System Operators (TSOs) from the allocation of interconnector capacity; and
- the actual use of revenues by interconnector TSOs over the period 1 January to 31 December.
EWIC, IFA, NGIFA2, Nemo Link and NGNSL have reported to Ofgem with respect to total revenues made and the actual use of revenues for the period 1 January 2021 – 31 December 2021.
Main document
[Electricity Interconnector Use of Revenues Report for 2021 [PDF, 109.08KB]
Related links
- Use of Congestion Income Statement for 2020
- Decision on proposed modifications to the standard conditions of the electricity interconnector licence, the special conditions of the electricity interconnector licence held by NGIL and the electricity transmission licence held by NGESO